At which stage during the high-level process of loading interval initial measurement data does Meter Data
Management (MDM) normalize measurements and why?
For a Meter Data Management (MDM) implementation, a customer requires specific bill determinants along
with bill determinant calculation validations to be executed, before the determinant values are exported to their customer information system (CIS).
Which THREE factors should you consider while configuring usage calculation groups?
A customer is starting an Advanced Meter Infrastructure (AMI) roll-out initiative and they plan to replace their
legacy scalar time-of-use (TOU) meters with smart meters. They want customer information system (CIS) to
continue to bill for the same TOU periods and they do not want to change the CIS rates.
In which THREE ways can you configure Meter Data Management (MDM) to support this requirement?
The interval proxy day estimation Validation, Estimation, and Editing (VEE) rule estimates missing intervals
by selecting interval data to average from a list of days that are most like the day being estimated. This is
achieved by measuring the component comparison periods.
What is used to define the proxy?
A time-of-use (TOU) template's interval size controls the values allowed as start and end times. A template
can be used to generate TOU data for TOU maps whose seconds per interval (SPI) is divisible by the
template's SPI.
For what can you use a 60-minute template?