An administrator wants to configure vRealize Operations to operate in Continuous Availability mode for resiliency. The administrator has deployed all required nodes, registered the nodes as members of the vRealize Operations cluster, and must now configure the Continuous Availability mode.
An administrator has enabled the allocation model in a policy and set the CPU overcommit ratio to 4:1 for all
vSphere clusters in a vSphere datacenter.
Why would vRealize Operations report that the cluster has 0 days remaining when the actual CPU overcommit
ratio is less than the 4:1 configured value?