  • Question 1
    • The documents needed for a quantity survey include:

      Answer: D
  • Question 2
    • Which of the following is a non-cash outlay associated with a process manufacturing project?

      Answer: A
  • Question 3
    • After planning, what is the first process in estimate preparation?

      Answer: C
  • Question 4
    • If one (1) meter is equal to 3.28 feet, how many cubic meters of concrete, rounded to the nearest cubic meter, are required to pour a foundation that is 15 feet long by 10 feet wide by 6 feet thick, disregarding waste?

      Answer: D
  • Question 5
    • In a manufacturing operation, at 100 percent of capacity, annual costs are as follows:

      Fixed expenses $5,203,440

      Variable expenses $7,091,040

      Semi-variable expenses $6,217,750

      Sales $26,385,480

      Given that semi-variable expenses at zero production equal 30% of such expenses at 100% of capacity,

      the respective shutdown and break-even points would be:


      Answer: D