During a daily production meeting, the materials manager discusses a priority shipment that is being delayed due to material being placed on hold from a nonconformance. The process engineer was present when the material was placed on hold and states that the nonconformance will not impact fit. form or function. The manufacturing manager shares that per the ISO standard, the risk should be accepted and the product should be shipped. Which action would be most appropriate for the quality engineer to take first?
During the causes of a problem have been verified in the analysis phase of a six sigma project, they will form the basis of the solution in Much of the following phases?