You are responsible for planning the non-functional testing for a new product. You will be responsible for the
performance testing and you have determined that you will need a simulator to complete your work, Which of
the following are considerations when purchasing a simulator? 1.Path testing of the tool
2.Time to test the tool
3.cost of hmng specialists
4.Susceptibility to the "probe effect"
5.Method and bme to upgrade and retest the tool as the software changes
6.Control flow analysis
You are testing software that requires you to enter defined order numbers and either add, delete or update the
information associated with that order number, which of the following is the minimum set of columns you
should see in your keyword-driven input table?
Consider the pseudo code provided below:

Given the following tests, what additional test(s) (if any) would be needed in order to achieve 100% statement
coverage, with the minimum number of tests?
Test 1: A = 7, B = 7, Expected output: 7
Test 2: A = 7, B = 5, Expected output: 5
Which option correctly states the sequence of tasks to be undertaken when re-factoring test cases?
SELECT ONE OPTION
© Copyrights DumpsEngine 2025. All Rights Reserved
We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsEngine.
