Free iSQI CTAL-TTA_v.4.0_UK_IE Exam Questions

Absolute Free CTAL-TTA_v.4.0_UK_IE Exam Practice for Comprehensive Preparation 

  • iSQI CTAL-TTA_v.4.0_UK_IE Exam Questions
  • Provided By: iSQI
  • Exam: ISTQB Certified Tester Advanced Level - Technical Test Analyst (Syllabus 2019)
  • Certification: ISQI certification
  • Total Questions: 238
  • Updated On: Jan 15, 2026
  • Rated: 4.9 |
  • Online Users: 476
Page No. 1 of 48
Add To Cart
  • Question 1
    • The result of a product risk analysis performed on components I, II and III
      of the airplane control system shows the following risk matrix:
      ATTA-page23-image2
      The project wants to mitigate the risks by defining different types of coverage depending on the risk level of
      the components. Which of the following would be a meaningful solution for setting the coverage targets?

      Answer: A
  • Question 2
    • When performing code reviews, which of the following defect types will be most difficult to find?

      Answer: C
  • Question 3
    • Which specification-based technique could be used to enhance coverage for this code fragment?

      Answer: A
  • Question 4
    • Exhibit:
      ATTA-page23-image13
      Identify TWO main advantages of this approach to incident management. 

      Answer: A,B
  • Question 5
    • A project to replace your company's sales and merchandising system has begun. The old system is still in production but is poorly documented and expensive to maintain: changing it has often produced a large quantity of defects. The new version will be developed using modern techniques and technology. Requirements include: Loading sales data, sent electronically from the stores each evening, into a central database where it is then available for other applications. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores. Predictions of future demand for each product, based on a combination of sales history and forecasting parameters. Requirements 1 and 2 are satisfied by the existing system and will be rewritten with no significant changes. Requirement 3 is new: these forecasting reports will be run overnight, and users will request them by entering simple parameters online during the day. The sales data are loaded in an overnight batch run. There have been problems at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the working day. As a Technical Test Analyst, you have been asked to contribute to the project's Master Test Plan. The key stakeholders are: The Merchandising Manager, who wants parameter entry to be quick and easy. The Data Centre Manager, who requires the new batch jobs to take less time than the old ones. No specific performance requirements have been given, either for the batch jobs or for online parameter entry. Which TWO of the following will BEST meet the objectives of the stakeholders? 


      Answer: A,B
PAGE: 1 - 48
Add To Cart

© Copyrights DumpsEngine 2026. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsEngine.