Free iSQI CTFL-AT_UK_NN Exam Questions

Absolute Free CTFL-AT_UK_NN Exam Practice for Comprehensive Preparation 

  • iSQI CTFL-AT_UK_NN Exam Questions
  • Provided By: iSQI
  • Exam: ISTQB Certified Tester - Foundation Level Extension, Agile Tester (Non Native)
  • Certification: ISTQB Certified Tester
  • Total Questions: 317
  • Updated On: Nov 25, 2025
  • Rated: 4.9 |
  • Online Users: 634
Page No. 1 of 64
Add To Cart
  • Question 1
    • User Story: " When I execute the add function from line 2234 to 2270, there should not be any exception."
      TC1: compile and execute the integrated build and check the execution does not exceeds 3 seconds
      TC2: Run the unit test made before coding this section, within a tight loop until it passes Which quadrants  matches the test cases developed above

      Answer: B
  • Question 2
    • Consider the following user story for an Agile project aimed at developing an application that calculates the reimbursement of medical visits: "As an owner of the application, I want the reimbursement of medical visits to be calculated based on the following rules: There are two types of reimbursable visits: Doctor's Office Visits (DOCVs) and Hospital Visits (HVs). The reimbursement for DOCVs is 33%, while the reimbursement for HVs depends on the type of the specialist visits. Two types (A, B) of specialist visits exist and the associated reimbursements are 45% for A and 90% for B." Which of the following would you expect to be the most suitable black-box test design technique for the user story?


      Answer: A
  • Question 3
    • Which of the following test activities is typically done during agile projects, but is not as common on traditional projects? 

      Answer: B
  • Question 4
    • During a release planning session, the agile team is breaking down stories into smaller stories for better understanding. In order to do that, they need to measure how many story points are there. What strategy they can follow to effectively find story points for a particular story?

      Answer: A
  • Question 5
    • Risk analysis is done only during release planning, not during iteration planning.

      Answer: B
PAGE: 1 - 64
Add To Cart

© Copyrights DumpsEngine 2025. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsEngine.