The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s.
After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2
/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s.
What should the Implementation Engineer do to resolve this issue and complete the install?
An evacuation is already in progress when the Account Team informs the Implementation Engineer that the
customer wants to include another data pack to the evacuation. How should the Implementation Engineer
proceed With this request?
The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s.
After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2
/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s.
What should the Implementation Engineer do to resolve this issue and complete the install?