When calculating the power demand of a UPS (Uninterruptible Power Supply) system, only the backend capacity needs to be considered, and redundancy for the load does not need to be accounted for, while the capacity of the battery can be ignored.
For a data center with a standard designation of GB50174-A, which of the following descriptions regarding the load classification is incorrect?
In a data center with an IT load level of Grade B, it is not necessary to configure dual power paths.
If a cooling system uses a DX scheme, it can plan the deployment sequence of the air handling units and outdoor units accordingly.