A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?
During construction, the general contractor notices conflicting information between the construction drawings and the specifications. The FIRST step the contractor should take is to
The project team is reviewing a mock-up of a faux plaster ceiling finish. The mock-up is a 4'x4' board on an easel in the contractor’s construction trailer. What should the designer request?