What must a project team inventory to determine if a project has enough reused surfaces to document
Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?
A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable
to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction:Commercial Interiors?
In addition to the basic requirements for Energy and Atmosphere, Fundamental Commissioning and
Verification, which is required to achieve Energy and Atmosphere, Enhanced Commissioning, Option 1?
What should a team focus on first to significantly improve energy performance or achieve the lowest possible
operation cost?