Free NCARB PDD Exam Questions

Absolute Free PDD Exam Practice for Comprehensive Preparation 

  • NCARB PDD Exam Questions
  • Provided By: NCARB
  • Exam: ARE 5.0 Project Development and Documentation Exam
  • Certification: NCARB Certifications
  • Total Questions: 101
  • Updated On: Jan 12, 2026
  • Rated: 4.9 |
  • Online Users: 202
Page No. 1 of 21
Add To Cart
  • Question 1
    • A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code

      that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility

      on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and

      market. The architect is ready to submit the drawings to the Owner for the 50% construction documents

      review.

      To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The

      Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for

      review, due to the lead time on this critical path item. Once construction begins, farming operations must be

      able to continue uninterrupted.

      Key project information includes:

      Brewing and distilling will operate year-round.

      Brewery will initially include four fermenting tanks. Owner has requested space for at least two

      additional tanks. Potential expansion will be based on future sales.

      Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are

      required.

      Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have

      views to the working orchards and the historic buildings on site.

      Tap Room is scheduled to be open from August through November. Owner would like options to

      extend operating dates based on popularity.

      The Market area will feature local farm products and is not conditioned.

      Entire building will be fully sprinklered.

      Selected building materials are low-maintenance, as requested by the Owner, for durability and to

      reflect the nature of a working farm.

      Mechanical and electrical systems will be hung from the building structure. These loads are included in

      PEMB shop drawings.

      Public water and sewer is not available at the Project Site.

      Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

      The following resources are available for your reference:

      Architectural Drawings, including plans, elevations, sections, and schedules

      Consultant Drawings, including structural, HVAC, power distribution, and plumbing

      PEMB Shop Drawings

      Design and Construction Schedule

      Specification Excerpts, showing relevant spec sections

      IBC and ADA Excerpts, showing relevant code and accessibility sections

      After reviewing the documents, the architect discovers a coordination issue in the corridor.

      The owner is concerned about elevated noise levels in the Tap Room when fully occupied. The current design utilizes a 2 x 2 acoustic ceiling tile system installed above the fans. An acoustical engineer recommends noise mitigation through limiting reverberation time (RT) to 2.0 seconds or less in the space. This can be achieved by the provided ceiling material options and their corresponding area. What should the architect recommend that will minimize additional project costs while providing the recommended acoustical solution? 

      Answer: D
  • Question 2
    • Proposed trees along a residential street next to a new development site should first be selected based on which of the following?


      Answer: B
  • Question 3
    • A significant advantage of glass-fiber-reinforced concrete panels over architectural precast concrete panels is which one of the following?


      Answer: C
  • Question 4
    • Which of the following is most appropriate to coordinate ceiling-mounted HVAC diffusers? 

      Answer: A
  • Question 5
    • A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.

      To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The

      Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for

      review, due to the lead time on this critical path item. Once construction begins, farming operations must be

      able to continue uninterrupted.

      Key project information includes:

      Brewing and distilling will operate year-round.

      Brewery will initially include four fermenting tanks. Owner has requested space for at least two

      additional tanks. Potential expansion will be based on future sales.

      Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are

      required.

      Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have

      views to the working orchards and the historic buildings on site.

      Tap Room is scheduled to be open from August through November. Owner would like options to

      extend operating dates based on popularity.

      The Market area will feature local farm products and is not conditioned.

      Entire building will be fully sprinklered.

      Selected building materials are low-maintenance, as requested by the Owner, for durability and to

      reflect the nature of a working farm.

      Mechanical and electrical systems will be hung from the building structure. These loads are included in

      PEMB shop drawings.

      Public water and sewer is not available at the Project Site.

      Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.

      The following resources are available for your reference:

      Architectural Drawings, including plans, elevations, sections, and schedules

      Consultant Drawings, including structural, HVAC, power distribution, and plumbing

      PEMB Shop Drawings

      Design and Construction Schedule

      Specification Excerpts, showing relevant spec sections

      IBC and ADA Excerpts, showing relevant code and accessibility sections

      After reviewing the documents, the architect discovers a coordination issue in the corridor.

      The owner wants to add a small storage closet with dimensions of 4'-0" L x 4'-0" W in the Laundry Room

      along column line 1. The closet will have access from the corridor only.

      Which of the following documents require revision due to this addition? Check the three that apply.


      Answer: A,B,C
PAGE: 1 - 21
Add To Cart

© Copyrights DumpsEngine 2026. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the DumpsEngine.