  • Question 1
    • A construction project involves dozens of stakeholders. Most of them need high-level information and updates about the project status, while the rest need more detailed information and frequent updates. Therefore, the project manager decides to set up an action plan to respond to these different requirements.

      What should the project manager create?


      Answer: C
  • Question 2
    • A senior construction professional works on a nuclear power plant which will be planned and executed using the Advanced work packaging (AWP) approach. After the definition of construction work areas (CWAs), the construction professional moved on to the preparation for the workface planning phase. One of the project planning team wondered about the relationship between the Engineering Work Packages (EWP), the Construction Work Packages (CWP), and the Installation Work Packages (IWP).

      What should the construction professional’s answer be? (Select two)


      Answer: A,D
  • Question 3
    • A construction professional decides to use the PDRI tool throughout the Front End Planning (FEP) process. The construction professional defined four assessment points: after the feasibility study, after the concept phase, during the detailed scope phase, and at the end of the FEP phase.

      How will the PDRI score typically evolve through these assessment points?


      Answer: B
  • Question 4
    • Upon the increasing number of accidents in a large construction project that employs hundreds of workers, the steering committee decides to track the locations of everyone on the field to ensure quick interventions.

      What technology should the construction professional use in order to implement the steering committee decision?


      Answer: B
  • Question 5
    • A construction professional is leading a major road construction project to ease traffic congestion in a metropolitan area. During project execution, the contractor, bound by contract to provide regular status reports and participate in progress evaluation meetings, abruptly ceased these obligations, claiming that these activities are excessively time-consuming. The project is at a critical phase with tight deadlines and high stakeholder expectations.

      What should the construction professional do first?


      Answer: B