During the preparation of the construction documents, it was noted that the survey inaccurately located the property line. Consequently, the parking layout had to be redesigned to fit within the corrected property boundary. The architect's additional costs and associated delay are the responsibility of which one of the following parties?
According to AIA Document B201, the architect must perform which of the following services during Construction Contract Administration? Check the three that apply.
The architect's contract with the owner has a budget of construction cost, and the architect has established a budget of cost in the mechanical engineer's contract. The mechanical bid package is 36% over the budget. What is the engineer required to do?
An architect is evaluating a change order. Where should the costs for the project superintendent or general foreman be included?