A team is running out of time to draft their PI Objectives for the draft plan review because they are creating very detailed plans. What is the best action for the Scrum Master to take?
At the end of the first Iteration, the team finishes User Stories A, B, and 50% of C. The Story sizes are set at these points: Story A = 8 points Story B = 1 point Story C = 5 points Story D = 3 points What is the team's velocity?